GasCov - The Latest Innovation in Gas Meter Set Protection!
Find Us On Facebook Follow us on Twitter Subscribe via RSS feeds Blog
About GasCov
Product
Installation
Galleries
Order Now
Builders
Contact Us
Links
Media
Testimonials
Blog
Installation
 

STEP 1

Position the mounting base on wall, behind gas meter set. Line up gas meter index with Lexan window on cover. Use level to make sure the mounting base is straight. Mark on mounting base where you will drill four holes.  Dependent on the plumber installation of the gas meter set, spacers (i.e. PVC) may be required behind the GasCov and mounted against the foundation wall.

STEP 2

Fasten the mounting base to wall utilizing a minimum of four (4) fasteners complete with washers.

For stone and brick we recommend using a drill with a 3/16" cement bit, and ¼" X 2 ¼" screws and ¼" flat washers.
For wood or siding we recommend using a drill with a 3/16" drill bit, and ¼" X 2 ½" screws and ¼" flat washers.

Please note:  Longer screws will be required if spacers are used.

STEP 3

To install cover, place cover over mounting base aligning arch ridges with cover and fasteners. Push to snap on. To remove cover, pull from bottom of cover and push to lift the cover.

NOTE: If existing meter set piping obstructs the positioning of the retrofit mounting base and/or cover, notches can be made to the cover and mounting base to accommodate piping.

If you have any questions please call Customer Service on our toll free number 1-877-427-9255 between the hours of 8:30 a.m. – 4:30 p.m. EST



TOOLS REQUIRED:

1. Level
2. Hammer Drill with 3/16" cement bit
3. 4 screws and washers (see above)
4. Jig Saw or Hole Saw (if notches need to be made)

Outside Measurements of GasCov: 30 ½" Wide x 30" High



DISCLAIMER:

GasCov® Ltd. recommends the professional installation of its products by an approved installer. Please contact us at 1-877-427-9255 to make an appointment.

 
About Us - Product - Installation - Galleries - Order Now - Contact Us - Links - Media - Testimonials