|
STEP 1 Position the mounting base on wall, behind gas meter set. Line up marking on right hand side of mounting base with
meter index . Use level to make sure the mounting base is straight. Mark on mounting base where you will drill four holes.

STEP 2 Fasten the mounting base to wall utilizing a minimum of four (4) fasteners complete with washers.
For stone and brick we recommend using a drill with a 3/16" cement bit, and 1/4" x 2 1/4" screws and 1/4" flat washers.
For wood or siding we recommend using a drill with a 3/16" drill bit, and 1/4" x 2 1/2" screws and 1/4" flat washers.

STEP 3 Snap on the cover for final installation.

NOTE: If existing meter set piping obstructs the positioning of the retrofit mounting base and/or cover,
notches can be made to the cover and mounting base to accommodate piping.

If you have any questions please call Customer Service on our toll free number
1-877-427-9255 between the hours of 8:30 a.m. – 4:30 p.m. EST
TOOLS REQUIRED:
1. Level
2. Drill with 3/16" cement bit
3. 4 screws and washers (see above)
4. Jig Saw or Hole Saw (if notches need to be made)
DISCLAIMER:
GasCov® Ltd. recommends the professional installation of its products by an approved installer.
Please contact us at 1-877-427-9255 to make an appointment. |